Events & Alarms

PROD
Systems Operational02:55
Severity:
Status:
Sev.
Time
Source
Message
Status
Assignee
ID
14:32:01
Valve V-102

Pressure exceeded threshold - automatic shutdown initiated

Open
J. Smith
EVT-001
14:28:45
Sensor S-045

Temperature approaching upper limit

In Progress
M. Chen
EVT-002
14:15:22
System

Automated backup completed successfully

Resolved
Unassigned
EVT-003
13:58:11
Flowline FL-08

Throughput reduced by 15%

Open
Unassigned
EVT-004
13:42:33
Valve V-087

Communication lost - manual inspection required

In Progress
R. Davis
EVT-005
13:30:00
Automation

Rule LB-001 executed successfully

Resolved
Unassigned
EVT-006
13:15:44
Station Delta

Capacity utilization above 90%

Open
Unassigned
EVT-007
12:58:22
Well Gamma

Flow rate dropped below minimum threshold

Resolved
J. Smith
EVT-008
12:45:11
System

Maintenance window started

Resolved
Unassigned
EVT-009
12:30:05
Sensor S-012

Sensor calibration drift detected

In Progress
Tech Team
EVT-010
Showing 10 of 10 events
3 Critical4 Warning