System Health
98.2%
+0.5%vs last hour
Active Automations
147
+12%running
Open Incidents
3
-2%vs yesterday
Resolved Today
24
+8%vs average
System Throughput
01
02
03
04
05
06
07
08
09
10
11
12
100k75k50k25k0
Throughput (bbl/d)
+12.5% this month
Recent Events
14:32:01
Valve V-102
Pressure exceeded threshold - automatic shutdown initiated
Open
J. Smith
EVT-001
14:28:45
Sensor S-045
Temperature approaching upper limit
In Progress
M. Chen
EVT-002
14:15:22
System
Automated backup completed successfully
Resolved
Unassigned
EVT-003
13:58:11
Flowline FL-08
Throughput reduced by 15%
Open
Unassigned
EVT-004
13:42:33
Valve V-087
Communication lost - manual inspection required
In Progress
R. Davis
EVT-005
System Status
Primary Systems
OperationalAutomation Engine
RunningMonitoring
DegradedAssets Requiring Attention
Well Alpha
Production Well
Flow: 12,450 bbl/d
WL-001
Station Delta
Processing Station
Pressure: 2,340 PSI
ST-001
Valve V-102
Control Valve
State: Failed
VL-102